Repair works to this lovely old boat began in 2013.
In the Spring of 2013 the following jobs were undertaken:
- remove and replace port side garboard plank
- make, steam, fit and fasten new oak ribs
- router both sides of keel to hard timber and fit new pieces to port and stbd, glue, fasten, plug
- rake out and re-caulk rabbet line on starboard garboard plank
Phase 2. Spring 2014
- to spline and fill the split planks where the thwarts have created a pressure point
- rake out and fill gaps around rubbing strip and coaming beads
- make and fit a new stem head out of oak