
|
BOAT NAME:
|
DATE
|
NOTES
|
|
|
|
|
1.
|
Check/change zinc anodes
|
|
|
2.
|
Remove thermostat and check operation
|
|
|
3.
|
Connect hose and check engine starts
|
|
|
4.
|
Run engine and flush with fresh water
|
|
|
5.
|
Stop engine and pump engine/gearbox oils
|
|
|
6.
|
Drain fuel sample from tank
|
|
|
7.
|
Change/clean water separating pre-filter
|
|
|
8.
|
Clean strainer on lift pump (if fitted)
|
|
|
9.
|
Change final fuel filter
|
|
|
10.
|
Bleed fuel system
|
|
|
11.
|
Change oil filter(s)
|
|
|
12.
|
Fill with oil
|
|
|
13.
|
Check/change hoses and clamps
|
|
|
14.
|
Change antifreeze (indirect engines)
|
|
|
15.
|
Check operation of anti-syphon valve
|
|
|
16.
|
Run engine and check for leaks
|
|
|
17.
|
Flush with anti-freeze and stop
|
|
|
18.
|
Check oil levels
|
|
|
19.
|
Clean sea water filter(s) and replace
|
|
|
20.
|
Clean air filter, oil bores and seal
|
|
|
21.
|
Remove alternator/water pump belts
|
|
|
22.
|
Remove and store batteries - standard charge
|
|
|
23.
|
Spray engine with corrosion block
|
|
|
24.
|
Add biocide and fill diesel tank
|
|
|
25.
|
Block exhaust at skin fitting
|
|
|
26.
|
Clean bilge and fit oil absorbent pad
|
|
|
|
|
|
|
|
NB. The impeller is changed on re-commission
|
|
|
GENERAL COMMENTS:
…………………………………………………………………………………………………………
…………………………………………………………………………………………………………
…………………………………………………………………………………………………………
……………………………………………………………… Head of Engineering: Spencer Hamlyn
DIESEL ENGINE RE-COMMISSION
|
BOAT NAME:
|
DATE
|
NOTES
|
|
|
|
|
1.
|
Check notes from winterisation and act
|
|
|
2.
|
Refit batteries - standard charge
|
|
|
3.
|
Uncover and unseal engine openings
|
|
|
4.
|
Reconnect exhaust
|
|
|
5.
|
Check/change water pump impeller
|
|
|
6.
|
Tighten alternator/water pump belts
|
|
|
7.
|
Crank engine without starting
|
|
|
8.
|
Check oil and water levels
|
|
|
9.
|
Connect hose
|
|
|
10
|
Check hose clips and replace as required
|
|
|
11
|
Run engine; check water discharge
|
|
|
12
|
Check battery charge
|
|
|
13
|
Check throttle and gear controls
|
|
|
14
|
Clean engine bay
|
|
|
15
|
Pump bilge
|
|
|
|
|
|
|
GENERAL COMMENTS:
…………………………………………………………………………………………………………
…………………………………………………………………………………………………………
…………………………………………………………………………………………………………
…………………………………………………………………………………………………………
…………………………………………………………………………………………………………
…………………………………………………………………………………………………………
…………………………………………………………………………………………………………
…………………………………………………………………………………………………………
…………………………………………………………………………………………………………
Head of Engineering: Spencer Hamlyn